Showing posts with label MBTA Schedule Changes. Show all posts
Showing posts with label MBTA Schedule Changes. Show all posts

Monday, June 21, 2010

Spoiler Alert!

Damn, has it really been nearly two ratings since my last post!? Don't worry, the blog hasn't been discontinued yet (though the same can't be said for a certain Cabot bus route). Between searching for a condo, going to a friend's wedding in Vermont, and various side projects; I just haven't been able to give the old blog as much attention as I would like. I wonder how the guy at Universal Hub does it. Robots? Interns? Anyway, I have still been checking up on the goings on at the T. In addition, I have been reading and researching quite a bit about Boston's horse railroads and the early days of local public transit in the area. More on all that stuff later. Right now, I am off to Logan to catch a flight to the midwest, but before I go, I wanted to share some news.

The Summer 2010 Rating will enter effect this coming Saturday (June 26) and will end on Friday, September 3. Keep your eyes out for the blue schedule cards, which have a new look to them (you'll never guess what's on the covers). Here is a sneak preview of some of the changes:


All Routes - As is the case every summer, all supplemental school-day only trips will be put on hiatus until the fall. For the most part, this only covers the morning rush hour and early afternoon parts of the schedule; refer to individual schedule cards for details.

Ride Supplemental Route 9702 while you still can!

Route 08 - The 1:00a ("last train") weekday trips from Kenmore & UMass Boston have been discontinued due to low ridership.

Route 25 - Shall join Routes 06, 173, 246, 437, 743, and all the rest in Discontinued Routes Land. I made several attempts to ride and photograph the route, but the trips I picked were no-shows. Now where will Cabot get its extra buses during the morning rush hour?

Route 28 - Before you all start blaming the 04 or 191, it is because of the 28 that the 25 (created to supplement Warren Street bus service in the mornings) is being discontinued. All Route 28 service (except the 3:20a, 3:59a, and 4:20a trips from Mattapan) has been moved from Cabot to Southampton. And you know what that means... 60' buses providing all service! And they'll be hybrids too! The same number of trips shall be provided, but with the larger buses running, there will be more capacity. It is because of these extra seats that the 25 met its untimely end.

This sight will become a thing of the past.

And on the north side...

Route 73 - Due to roadwork in Belmont, the 73 will briefly switch over to diesel bus operation. Somerville will provide the buses. Things should be back to normal by the fall. Routes 71 and 77-4 will be slightly affected by this as well; check with the pullouts supervisor for details.

Route 114 - Route 114-0 (Maverick - Bellingham Square) will be changing its name (who's it trying to hide from?) to Route 116-7. The sign code has been changed accordingly, so look before boarding. It would be a shame to be heading to Revere and end up on a short turn. The Route 114-1 (Maverick - Mystic Mall), however, will keep on being the 114-1. With this change, the 114 will essentially become a midday only route. See the 114/116/117 schedule card for details.

And on the rails...

Route 903 - Better known to the riding public as the Orange Line, all service will switch over to Single Person Train Operation (SPTO). After 109 years, the Orange Line will no longer have door guards/conductors. Thank you all for your many years of hard work! Also, headways have been improved early mornings and late nights to every 10 minutes. If detailed Orange Line schedule cards were still printed, I'd advise you to refer to it for details. Sadly, this isn't the 1980s.



There are, of course, many more changes as part of the summer schedule changes. Visit the T website in the coming week for more details.


Farewell for now.

Thursday, December 24, 2009

New Variations & Derailments, Oh My!

Goodness! My last post was back in late October? The ol' blog was starting to collect some dust. Well, I'm back from my little hiatus...and what a time to be back. Where to begin?

Let's start with the Red Line. 1521 had mechanical problems Monday morning, but thankfully I was traveling in the opposite direction. But the Red Line was not going to let me get away that easily. Tuesday afternoon I was heading to Park Street to meet a friend for coffee. She had sent me a text telling me that she was stuck at Ashmont and would be late because "of something going on at Alewife". Hmm, I thought, must be signal trouble or problems with the crossover. But no, the "something going on at Alewife" was a derailment. Despite being informed that service was delayed due to a "disabled train" and shuttle buses would be operating between Harvard and Alewife, I had a gut feeling it was derailment. As a general rule of thumb, rail service is rarely bustitued due to just a disabled train. Service would be delayed, but still running. MBTA doublespeak, don't you just love it? Seeing as the news would eventually reach the media, why not be honest from the start? By the way, my friend and I met up at Park Street 35 minutes after the appointed time.

Shuttle Route 612 (or is it 613 that covers that part of the Red Line, I can't remember) kept things running, somewhat. Watching the coverage on Channel 7 that night I spotted a few NABI's that were drafted for the shuttle; meaning that Route 01 and 66 riders lost a few of their buses during the rush hour. Ouch. I could only imagine the scenes along Mass and Harvard Avenues. Thankfully, no one was hurt on the train and service was (sorta) up and running by the AM rush Wednesday.

But on to happier things...

So what will Plans and Schedules, er, I mean Santa bring us this Christmas? The Winter 2010 Rating enters effect this coming Saturday and with it will come plenty of stocking stuffers, among them:

The holidays came a little early for the residents of John Eliot Square this year. As a partial replacement for the 28, new variations of the 44 and 45 were created to add extra service in the area. It seems the 14 and 41 alone were not working for them. The new service began operation shortly after the Cabot "B" Pick, which made possible a series of improvements to the key bus routes at that garage. Routes 44-3 and 45-3 serve John Eliot Square weeknights after 8pm and all day weekends. The change will officially be announced on the upcoming schedules.

Residents of Granada Highlands will also get a new variant, Route 430-2, which will add two new round trips weeknights when the 411 is not operating. See the schedule card or the MBTA website for details.

But of course, the first package I am going to unwrap is the 111-2.

A new year, a new sign code, a new variation.

The 111 shall see sweeping improvements all across the board. In addition to extra vehicles at crucial times of the day, a new variation has been created. Route 111-2, Haymarket Station-Cary Square, will operate during the PM peak to supplement the regular 111-5 (Woodlawn) service. Headways and trip times have been adjusted to improve coordination between the two routes, so I encourage any of you 111 riders out there to pick up a new schedule card or visit the website. Midday and weekend service will also see some headway improvements, plus runtimes being adjusted to improve reliability. Like the 111-6 (Parkway/McDonald's) supplemental trips during the AM Peak, Route 111-2 (a.k.a. "Route 111C") will focus on the busiest part of the route and better meet the demand.

Visit the T website for more info on these and other changes.

On a final note, No Free Transfer will be changing its format slightly. Don't worry, I won't start writing posts in Nahuatl. Instead I will be writing more article-like posts, sorta like a newspaper column. But I will keep the quirky anecdotes and occasional rants. With that, happy holidays and see you all next year.

Monday, April 13, 2009

Wake Me When It's Over

So the word is out: the Globe has published a list of proposed service cuts that the MBTA is mulling over to close its $160,000,000 budget gap. I had hoped that the cuts would not be as bad as the 1981 service reductions (which seem to have faded from our collective memory), but in fact, they would be much worse. The good thing is that nothing is official...yet. To add insult to injury, many riders feel that the MBTA is just bluffing. Some people said the same thing back in 1981, then they woke up one Sunday to find that the Blue Line did not go to Wonderland anymore.

Let us take a look at some of the 2009 proposals "under consideration" and compare them with the cutbacks made in 1981; just to get an idea what we're in for.


2009 Proposal: "Eliminate service at Quincy & Lynn bus garages after 9 p.m. weekdays and all day on weekends"

1981 Equivalent: Eagle Street Garage (nee Carhouse) was closed on April 4, 1981. Its routes (110-121) were divided up between Charlestown Garage (110-112) and Lynn Garage (116-117, 119-121). Having been active since the days of streetcars, the garage was closed to cut costs. The site is now a (somewhat rundown) parking lot near Eagle Square in East Boston.

This proposal is terribly vague. Will service on the routes based at these garages be eliminated nights and weekends, or will they (like Fellsway and Albany) be covered by other garages? Lynn Garage is home to Routes 116 and 117, and I have a feeling chaos would ensue if service did not operate weeknights or over the weekend. I'm sure South Shore residents would be equally unhappy not have any service during these periods as well. And if another garage does cover them, you would have to train and familiarize the drivers with routes from another division. I know a few seasoned veterans at Charlestown who started out at Lynn...but that was fifteen to twenty years ago. Some might think that the 433 or 458 are still running.


2009 Proposal: "Eliminate customer service agents [CSA's] in subway stations"

1981 Equivalent: Some unstaffed token booths, a few station closings.

Several friends and I joked about personally staffing major downtown stations during our lunch breaks to give tourists and other riders directions, and to help with any CharlieCard issues. A volunteer CSA corps, if you will. But, alas! We could only do some much in an hour. So if you need help adding money to your card, or purchasing a ticket, I suppose you'll just have to watch someone else do it. Or visit youtube. Commuters will also lose touch with the "human side" of the T. Sure, you can call the information line or visit the website, but to have someone you can actually talk to in person; that can brighten up someone's day.


This photo happens to be from the final Route 195 trip.
TransitMaster had changed the sign before
I could get a photo of the bus displaying "195 DOWNTOWN".


2009 Proposals: "Eliminate highest net-cost-per-passenger bus routes" and "Eliminate routes due to network redundancy"

1981 Equivalent: Over 20 routes were eliminated and several pairs of routes combined (i.e. Routes 25 and 26 were merged to become the current Route 26).

Highest net-cost-per-passenger bus routes? What is "net-cost-per-passenger"? Basically, you take the total amount of money needed to operate the service, then subtract the revenue from fares ("farebox recovery"), then divide that by the total number of riders. The final value is the per-passenger subsidy the MBTA pays to keep service running. I went to mbta.com and pulled up a copy of the Final 2008 Service Plan. At the very end of the document is a table summarizing ridership, total cost of service, net-cost-per-passenger, service hours, etc.; all sorted by bus route. Doing a bit of digging I found some possible "high net-cost" candidates:

Route 48 Jamaica Plain Loop
Route 78 Harvard Station - Arlmont Village
Route 170 Dudley Station - Waltham Industrial Parks
Route 355 Haymarket - Woburn Industrial Parks
Route 435 Lynn - Liberty Tree Mall/Danvers Square
Route 436 Lynn - Liberty Tree Mall via Happy Valley
Route 465 Salem Depot - Danvers Square

Just to name a few...

The system wide average for a bus subsidy is about $1.50. These routes average over three times that amount! The "exotic routes" (i.e. Route 170 and 355) we may be able to live without. But what about the others? As for "network redundancies" (jargon, anyone?), please do away with Route 25 (Ruggles - Franklin Park via Dudley)! This route operates only during the AM Peak, with a fifteen minute headway, and carries about 203 people per day. Often when extra equipment is needed, the 25 is first to "donate" its buses. We could press on without the 25; Cabot would love to have the extra three buses available during the AM rush hour. Perhaps, however, some of the other "redundancies" would be more greatly missed.


2009 Proposal: "Eliminate E Branch on weekends, extend C Line to Lechmere; eliminate E Line service beyond Brigham Circle; eliminate Mattapan trolley after 8PM weekdays and all day weekends"; cut several Green Line surface stops.

In 1981: On Sundays shuttle buses replaced train service to Ashmont, Shawmut, Fields Corner, Savin Hill, Malden Center, Oak Grove, Suffolk Downs, Beachmont, Revere Beach, and Wonderland. The span of subway service was also reduced on Sundays; last trains were scheduled around 10PM or 10:30. Two stations were also closed completely.

What did the Mattapan High Speed Line do to deserve such a fate? After carrying passengers (daily!) since 1929, must it now become no more than a rush hour and midday only shuttle? The night and weekend alternative is Route 24.3 (a.k.a "Route 24/27"). Service on this route operates every 60 minutes weeknights and Sundays, and every 40-60 minutes Saturdays. If this proposal becomes reality, I strongly encourage Arborway to borrow some 60-footers from Southampton, otherwise you are going to have some packed (Routes 28 and 111 packed) NABIs traveling along River Street. As for the Green Line cutbacks, no more E service on weekends? Do we really want all of those extra riders on the 39? And will cutting back service from Heath Street to Brigham Circle really save any money? The cantenary to Heath Street would still have electricity flowing through it (so no energy cost savings), the stops eliminated, save for Heath, are just segments of sidewalk with a "Green Line Stop" sign above them. Well, Fenwood Road does have a tall "T" sign, but you get the idea. Frankly, B Line stops are too close together, so cutting a few may not be the end of the world. The announcements sometimes stumble over each other, the stops are so close together: "Next stop Boston University West. Entering Boston University West." And doesn't BU have its own shuttle bus system? Well, enough of my ranting about Boston University.

More to come later...

Friday, March 20, 2009

Spring Is In The Air!

Spring is in the air! And with springtime that means new schedules are on the way. The spring schedule changes enter effect tomorrow, so keep an eye out for the magenta colored schedule cards.

Tuesday, December 23, 2008

The Winter 2009 Rating

The MBTA will issue new schedules this coming Saturday (December 27). Be sure to pick up the green ones from the station or your driver. See the MBTA website for details.