Showing posts with label Bus Rapid Transit. Show all posts
Showing posts with label Bus Rapid Transit. Show all posts

Friday, October 23, 2009

Route 751 (The "SL4")


Because we all know that the real SL4 would have been the "stillborn" Silver Line Waterfront branch from South Station to Andrew Station via D Street, I shall hereafter refer to the new SL4 service as either the Silver Line Connector or by its route number, Route 751 .

And speaking of the 751...

For the first time since the days of the Atlantic Avenue Elevated riders once again have a one-seat ride from Dudley Station to South Station. The bus stop is even located near where the old elevated station used to be. While it may take a little longer than it used to, at least there aren't any pesky hairpin turns to worry about. (Rounding the curve from Harrison Avenue to Beach Street, one often felt you would fall right off the elevated structure.) I was able to make it out to the ribbon cutting ceremony on the 13th. Special guests included Mayor Menino, Secretary Aloisi, and several state legislators. See below for some photos I snapped.

While most Silver Line riders are still getting used to the new service, it appears to have been received well. Trunk headways along Washington Street have seen a slight improvement, albeit with bunching during the rush hours, and the four extra buses along the corridor during the peak are surely welcomed. With the buzz still in the air, many riders are asking where does it go, how often does it operate, and what's the transfer policy for passengers going to/from the Connector and Waterfront services. All of your questions can be answered by talking to a Silver Line operator and/or picking up the new Silver Line schedule card (featuring all services).

But what about ridership? Namely, how much will develop? Most longtime Route 749 riders are content (so to speak) with their Dudley Square-Temple Place service. Will any of them be siphoned onto the 751? Some of my personal observations show midday ridership to be rather light, with only 3-10 people boarding at South Station with me during these hours. Perhaps in time a ridership base will grow. If off-peak ridership continues to be light, Southampton will hopefully switch over to the forty-footers during these times.

Well, the 751 certainly beats that $2,000,000,000+ tunnel that would have wormed its way through Chinatown. All that's left to do is lay the track, put up the catenary, and convert it all to light rail!








Monday, June 22, 2009

A Ray of Sunshine

Today I opened the Metro and found on page two an article about the T. To my surprise is was neither about the impending fare hikes and service cuts, nor about the T's financial woes. It was a piece about the A Line! It was good to see something, frankly, positive about the T. Perhaps someone will do a write up about the City Point Line (now Route 09) or the Egleston/Lenox Street Line (now Routes 22 and 43).

I also took the Blue Line shuttle over the weekend (the line was closed for work at Maverick). It was a real family affair: Cabot, Charlestown, and Lynn all had equipment running on the shuttle, creating a nice mix of NABIs (2219, 2223, et alia), New Flyers, and even the occasional RTS (0240, 0322). Blue Line service was back up by Sunday night, slightly ahead of schedule. I'm sure Ed Dana would be proud.

Tuesday, May 26, 2009

Needs More Trolley Bell

Wishful thinking? A "green" Silver Line map installed at Mattapan Station

Tonight a community meeting will be held at the Mattapan Branch Library to discuss improvements for the Route 28 corridor. The conversion of the heavily traveled route into an extension of the Silver Line will be on the table for public review. Nice to let the public get involved.

Route 28 riders in the not-to-distant future will see their service upgraded to Bus Rapid Transit standards, certainly a step up from the current service provided. The boost promises to bring a better and faster commute to Mattapan, Dorchester, and Roxbury residents. It shall feature priority signaling, HOV lanes, improved bus stop amenities, sixty-foot vehicles, among other delightful BRT elements. It even has a cool name: The "28X"! What more could a transit-dependent community ask for!?

Perhaps real rapid transit, you know, the kind with tracks and a grade separated right-of-way?

For a community that has not seen a trolley since the days of the Type 5's (that would be circa 1955), would replacing a bus with a shinier and larger bus actually provide adequate transit? South End and Roxbury residents still have the sour tastes in their mouths from the Route 49 conversion to the Silver Line. Or as they call it, the "Silver Lie". Will the "28X" really be immune to the problems that the Silver Line Washington Street faces almost daily? Like the Route 49 and ex-Washington Street Elevated riders, are these residents going to be given the short end of the straw when it comes to "real" rapid transit?

It is great to see the MBTA and the Executive Office of Transportation investing so much money in public transit (take that, automobile lobby!). Any improvement to the Route 28 corridor is a great one, but I still have my doubts and some questions. Namely, what happened to that proposed Orange Line branch to Mattapan?

More to come later...